On December 1, we will be embarking on a special trip with Novita's 2017 Christmas calendar socks. Join us on a 24-day knit-along journey to winter wonderland. The finished socks make playful use of various lace patterns and other textures which are inspired by Christmas as well as by nature during the winter months in the Northern Hemisphere.

From December 1 through 24, a new window in the calendar will be opened every day by 9.00 am.

The socks will be knitted from Novita's classic Novita 7 Veljestä yarn. You will be needing two balls of 7 Veljestä in Off-white (010), as well as two sets of 3½ mm double-pointed needles – or one long circular needle if you prefer to use the Magic Loop technique. Order your supplies from novitaknits.com where you will find sets for the project with double-pointed needles or with 100 cm circular needles. Insert promotion code J2017 at checkout and you will receive two sweet Merry Knitmas labels as a free gift.

Use hashtag #novitajoulukalenterisukka2017 in Instagram to have a chance to win a soft Novita yarn surprise and to see how other knitters are making progress with the project. #novitajoulukalenterisukka2017 #kal #novitaknitalong #novitaknits Let's make this December a joint trip into Christmas wonderland!

Sizes  XS/S(M)L

Circumference at calf approx. 34(38)42 cm

Demand Novita 7 Veljestä

(010) Off-white  200(200)250 g

Double-pointed needles Novita 3½ mm or the size needed to obtain the gauge, or a Novita 3½ mm circular needle (100 cm) or the size needed.

Stitch pattern Knit following the charts and the written instructions.

Gauge

21 sts in pattern = 10 cm

Buy the kit for the sock!

 

Jump to

Day 1

Day 2

Day 3

Day 4

Day 5

Day 6, 7 and 8

Day 8

Day 9

Day 10

Day 11

Day 12

Day 13

Day 14

Day 15

Day 16

Day 17

Day 18

Day 19

Day 20

Day 21

Day 22

Day 23

 

 

Day 1

If you are using double-pointed needles, cast on 56(64)72 sts and distribute them evenly onto four needles. The beginning of the round is between needles I and IV.

If you are using the Magic Loop technique, cast on 56(64)72 sts onto the circular needle for the 1st sock and, from another ball of yarn, cast on another 56(64)72 sts onto the same needle for the 2nd sock. Divide the sts for the 1st sock into two groups by pulling a loop of cable from between the middle two sts. Do the same for the 2nd sock.

Purl 1 round and begin the lace pattern from row 1 of chart:

Row 1: *Slip 1 st onto the right-hand needle, k2 and pass the slipped st over these 2 sts removing it from the needle. P1, k1 through the back loop (=tbl), p1, k1tbl, p1*, repeat *–* for a total of 7(8)9 times.

Row 2: *K1, make a yarn over, k1, p1, k1tbl, p1, k1tbl, p1*, repeat *–* for a total of 7(8)9 times.

Row 3: *k3, p1, k1tbl, p1, k1tbl, p1*, repeat *–* for a total of 7(8)9 times.

Row 4: Work as you did on row 3.

Repeat rows 1–4 of the chart for 4 times in total. Work row 1 once more. 7(8)9 sts decreased on the last row, 49(56)63 sts on the needles.

 

Day 2

Knit 1 round and then purl 1 round. Knit the next round and at the same time evenly increase 3(4)5 sts = 52(60)68 sts. *K1, make the bobble (= knit the same st 3 times, first through the front loop, then through the back loop and then through the front loop again). Turn work, p3, turn work, k2, slip the 2nd stitch on the right-hand needle over the 1st st, k1 and again slip the 2nd st over this st, k2*. Repeat *–* for a total of 13(15)17 times. Knit 1 round, purl 1 round, knit 1 round. *K3, make the bobble*. Repeat *–* for a total of 13(15)17 times. Knit 1 round, purl 1 round.

 

Day 3

Knit 1 round and at the same times increase 0(2)4 sts = 52(62)72 sts. Purl 2 rounds. Continue working from row 1 of the chart:

Row 1: P1, follow the chart: *p1, p2tog, knit the next st twice (first through the back loop and then through the front loop), p3, knit the next st twice, p2tog*. Repeat *–* for a total of 5(6)7 times and then p1.

Row 2: P1. *P1, k2tog, make a double yarn over, work the skp decrease (= slip 1, knit 1, pass the slipped st over), p1, k2tog, double yarn over, skp*. Repeat *–* for a total of 5(6)7 times and then p1.

Row 3: P1. *P1, k1, knit the 1st yarn over, purl the 2nd yarn over, k1, p1, k1, purl the 1st yarn over, knit the 2nd yarn over, k1*. Repeat *–* 5(6)7 times in total and then p1.

Row 4: P1. *P1, k3, yo, k3tog (sl1 st knitwise, k2tog, pass the slipped st over) , yo, k3*. Repeat *–* 5(6)7 times in total and then p1.

 

Day 4

Continue the pattern from row 1 of chart:

Row 1: P1. Work following the chart: *p1, k9*. Repeat *–* 5(6)7 times in total and then p1.

Row 2: P1. *P1, yo, k3, k3tog (= sl1 st knitwise, k2tog, pass the slipped st over) , k3, yo*. Repeat *–* 5(6)7 times in total and then p1.

Row 3: P1. *P1, p1 through the back loop (=tbl), k7, p1tbl*. Repeat *–* 5(6)7 times in total and then p1.

Row 4: P1. *P2, yo, k2, k3tog, k2, yo, p1*. Repeat *–* 5(6)7 times in total, p1.

Row 5: P1. *P2, p1tbl, k5, p1tbl, p1*. Repeat *–* 5(6)7 times in total, p1.

Row 6: P1. *P3, yo, k1, k3tog, k1, yo, p2*. Repeat *–* 5(6)7 times in total, p1.

Row 7: P1. *P3, p1tbl, yo, k3tog, yo, p1tbl, p2*. Repeat *–* 5(6)7 times in total, p1.

Row 8: P1. *P4, p1tbl, p1, p1tbl, p3*. Repeat *–* 5(6)7 times in total, p1.

 

Day 5

Knit 1 round and at the same time decrease 2 sts = 50(60)70 sts.

Row 1: *Slip 1 st and at the same time make a yarn over (=sl 1 yo), p1*. Repeat *–* 25(30)35 times in total.

Row 2: *Knit the st together with its yarn over, slip 1 yo*. Repeat *–* 25(30)35 times in total.

Row 3: *Slip 1 yo, purl the st together with its yarn over*. Repeat *–* 25(30)35 times in total.

Row 4: Work as you did on row 2.

Row 5: Work as you did on row 3.

Row 6: Work as you did on row 2.

Knit 1 round (knit the st together with its yarn over) =50(60)70 s.

 

Day 6, 7 and 8

If you are using double pointed needles, distribute the sts evenly onto 4 needles: 13, 12, 12 and 13 (15, 15, 15 and 15) 18, 17, 17 and 18 sts.

For the Magic Loop technique, place 25(30)35 sts onto needle 1 and 25(30)35 sts onto needle 2 on the 1st sock as well as on the 2nd sock.

Double-pointed needles: Work following the chart and written instructions below

Row 1: Work chart A: k3, skp, k4.
Work chart B: *p2, k1tbl*, repeat *–* 2(4)6 times in total and p2(1)0.
Work chart C: p16 and then p2(1)0 and move to chart D: *k1tbl, p2*, repeat *–* for a total of 2(4)6 times. Work chart E: k4, k2tog, k3. 2 sts decreased on this round, 48(58)68 sts on the needles.

Row 2: Chart A: k8. Chart B: *p2, k1bl*, repeat *–* 2(4)6 times in total, p2(1)0.
Chart C: p6, make the 5 st bobble (k1, yo, knit the same st again, yo, knit the same st, turn work, k5, turn work, p5. Pass the 2nd, 3rd, 4th and 5th sts over the 1st st), p2, 5 st bobble, p6, p2(1)0.
Chart D: *k1tbl, p2*, repeat *–* 2(4)6 times in total. Chart E: k8.

Row 3: Chart A: k1, yo, k1, yo, skp, 4 st cable turn to the left (hold 2 sts in front, k2, knit the 2 sts on hold).
Chart B: *p2, work a 3 st bobble (knit the st through the front loop, through the back loop and again through the front loop, pass the 2nd and 3rd st over the 1st st), p2, k1tbl*,repeat *–* 1(2)3 times in total, p2(1)0.
Chart C: p3, 5 st bobble, p2, k1, p2, k1, p2, 5 st bobble, p3, p2(1)0.
Chart D: *k1tbl, p2, 3 st bobble, p2*,repeat *–* 1(2)3 times in total.
Chart E: 4 st cable turn to the right (hold 2 sts in back, k2, knit the 2 sts on hold), k2tog, yo, k1, yo, k1. 2 sts increased, 50(60)70 sts on the needles.

Row 4: Chart A: k9. Chart B: *p2, k1tbl*, repeat *–* 2(4)6 times in total, p2(1)0.
Chart C: p3, k1, p2, k1, p2, k1, p2, k1, p3, p2(1)0. Chart D: *k1tbl, p2*, repeat *–* 2(4)6 times in total. Chart E: k9.

Row 5: Chart A: k3, skp, k4. Chart B: *p2, k1tbl*, repeat *–* 2(4)6 times in total, p2(1)0.
Chart C: p1, 5 st bobble, p1, move 1 st to the left (place 1 st in front of the work, p1, knit the st in front), p1, move 1 st to the left, move 1 st to the right (place 1 st in back of the work, k1, purl the st in back),p1, move 1 st to the right, p1, 5 st bobble, p1, p2(1)0.
Chart D: *k1tbl, p2*, repeat *–* 2(4)6 times in total.
Chart E: k4, k2tog, k3. 2 sts decreased, 48(58)68 sts on the needles.

Row 6: Chart A: k8. Chart B: *p2, k1tbl*, repeat *–* 2(4)6 times in total, p2(1)0.
Chart C: p1, k1, p2, k1, p2, k2, p2, k1, p2, k1, p1. P2(1)0. Chart D: *k1tbl, p2*, repeat *–* 2(4)6 times in total. Chart E: k8.

Row 7: Chart A: k1, yo, k1, yo, skp, 4 st cable turn to the left (hold 2 sts in front, k2, knit the 2 sts on hold). Chart B: * p2, k1tbl, p2, 3 st bobble (knit the st through the front loop, through the back loop and again through the front loop, pass the 2nd and 3rd sts over the 1st st)*, repeat *–* 1(2)3 times in total.
P2(1)0. Chart C: p1, move 1 st to the left (place 1 st in front of the work, p1, knit the st in front), p1, move 1 st to the left, p1, k2, p1, move 1 st to the right (place 1 st in back of the work, k1, purl the st in back), p1, move 1 st to the right, p1.
P2(1)0. Chart D: * 3 st bobble, p2, k1tbl, p2, *, repeat *–* 1(2)3 times in total.
Chart E: 4 st cable turn to the right (hold 2 sts in back, k2, knit the 2 sts on hold), k2tog, yo, k1, yo, k1.
2 sts increased, 50(60)70 sts on the needles.

Row 8: Chart A: k9. Chart B: *2, k1tbl*, repeat *–* 2(4)6 times in total.
P2(1)0. Chart C: p2, k1, p2, move 1 st to the left, k2, move 1 st to the right, p2, k1, p2. P2(1)0.
Chart D: *k1tbl, p2*, repeat *–* 2(4)6 times in total. Chart E: k9.

Row 9: Chart A: k3, skp, k4.
Chart B: *p2, k1tbl,*, repeat *–* 2(4)6 times in total.
P2(1)0. Chart C: p2, move 1 st to the left, p2, move 1 st to the left, move 1 st to the right, p2, move 1 st to the right, p2.
P2(1)0. Chart D: *k1tbl, p2*, repeat *–* 2(4)6 times in total.
Chart E: k4, k2tog, k3. 2 sts decreased, 48(58)68 sts on the needles.

Row 10: Chart A. k8. Chart B: *p2, k1tbl*, repeat *–* 2(4)6 times in total.
P2(1)0. Chart C: p3, move 1 st to the left, p2, k2, p2, move 1 st to the right, p3.
P2(1)0. Chart D: *k1tbl, p2*, repeat *–* 2(4)6 times in total. Chart E: k8.

Row 11: Chart A: k1, yo, k1, yo, skp, 4 st cable turn to the left (hold 2 sts in front, k2, knit the 2 sts on hold).
Chart B: * p2, 3 st bobble (knit the st through the front loop, through the back loop and again through the front loop, pass the 2nd and 3rd sts over the 1st st), p2, k1tbl *, repeat *–* 1(2)3 times in total.
P2(1)0. Chart C: p4, move 1 st to the left (place 1 st in front of the work, p1, knit the st in front), p1, k2, p1, move 1 st to the right (hold 1 st in back, k1, purl the st on hold), p4.
P2(1)0. Chart D: *k1tbl, p2, 3 st bobble, p2*, repeat *–* 1(2)3 times in total.
Chart E: 4 st cable turn to the right (hold 2 sts in back, k2, knit the 2 sts on hold), k2tog, yo, k1, yo, k1. 2 sts increased, 50(60)70 sts on the needles.

Row 12: Chart A: k9. Chart B: *p2, k1tbl*, repeat *–* 2(4)6 times in total.
P2(1)0. Chart C: p2tog, p3, move 1 st to the left, k2, move 1 st to the right, p3, p2tog.
P2(1)0. Chart D: *k1tbl, p2*, repeat *–* 2(4)6 times in total. Chart E: k9.
2 sts decreased, 48(58)68 sts on the needles.

Row 13: Chart A: k3, skp, k4.
Chart B: *p2, k1tbl*, repeat *–* 2(4)6 times in total. P2(1)0.
Chart C: p5, move 1 st to the left, move 1 st to the right, p5. P2(1)0.
Chart D: *k1tbl, p2*, repeat *–* 2(4)6 times in total. Chart E: k4, k2tog, k3.
2 sts decreased, 46(56)66 sts on the needles.

Row 14: Chart A: k8. Chart B: *p2, k1tbl*, repeat *–* 2(4)6 times in total.
P2(1)0. Chart C: p6, k2, p6. P2(1)0.
Chart D: *k1tbl, p2*, repeat *–* 2(4)6 times in total.
Chart E: k8.

Row 15: Chart A: k1, yo, k1, yo, skp, 4 st cable turn to the left.
Chart B: *p2, k1tbl, p2, 3 st bobble *, repeat *–* 1(2)3 times in total.
P2(1)0. Chart C: p2tog, p4, k2, p4, p2tog.
P2(1)0. Chart D: *3 st bobble, p2, k1tbl, p2*, repeat *–* 1(2)3 times in total.
Chart E: 4 st cable turn to the right, k2tog, yo, k1, yo, k1.
46(56)66 sts on the needles.

Instructions and chart for the Magic Loop technique:

 

Row 1: Size XS/S - (size M k1bl, p1) size L k1tbl, p2, k1tbl, p1.
Move on to chart B: p1, k1tbl, p2. Chart E: k4, k2tog, k3.
Chart A: k3, skp, k4. Chart D: *p2, k1tbl*, repeat *–* 2(4)6 times in total, p2(1)0.
Chart C: p16, p2(1)0. Chart F: *k1tbl, p2*, repeat *–* to end of round. 2 sts decreased, 48(58)68 sts on the needles.

Row 2: Size XS/S - (Size M k1tbl, p1) Size L k1tbl, p2, k1tbl, p1.
Move on to chart B: p1, k1tbl, p2. Chart E: k8.
Chart A: k8. Chart D: *p2, k1tbl*, repeat *–* 2(4)6 times in total, p2(1)0.
Chart C: p6, 5 st bobble (knit, yo, knit the same st again, yo, knit the same st, turn work, k5, turn work, p5. Pass the 2nd, 3rd, 4th and 5th sts over the 1st st), p2, 5 st bobble, p6, p2(1)0.
Chart F: *k1tbl, p2*, repeat *–* to end of round.

Row 3: Size XS/S - (Size M k1tbl, p1) Size L k1tbl, p2, k1tbl, p1.
Move on to chart B: p1, 3 st bobble (knit the st through the front loop, through the back loop and again through the front loop, pass the 2nd and 3rd sts over the 1st st), p2.
Chart E: 4 st cable turn to the right (hold 2 sts in back, k2, knit the 2 sts on hold), k2tog, yo, k1, yo, k1.
Chart A: k1, yo, k1, yo, skp, 4 st cable turn to the left (hold 2 sts in front, k2, knit the 2 sts on hold).
Chart D: *p2, 3 st bobble, p2, k1tbl*, repeat *–* 1(2)3 times in total, p2(1)0.
Chart C: p3, 5 st bobble, p2, k1, p2, k1, p2, 5 st bobble, p3, p2(1)0. Chart F: *k1tbl, p2, 3 st bobble, p2*,repeat *–* to end of round.
2 sts increased, 50(60)70 sts on the needles.

Row 4: Size XS/X - (Size M k1tbl, p1) Size L k1tbl, p2, k1tbl, p1.
Move on to chart B: p1, k1tbl, p2. Chart E: k9. Chart A: k9.
Chart D: *p2, k1tbl*, repeat *–* 2(4)6 times in total, p2(1)0.
Chart C: p3, k1, p2, k1, p2, k1, p2, k1, p3, p2(1)0.
Chart F: *k1tbl, p2*, repeat *–* to end of round.

Row 5: Size XS/S - (Size M k1tbl, p1) Size L k1tbl, p2, k1tbl, p1.
Move on to chart B: p1, k1tbl, p2. Chart E: k4, k2tog, k3.
Chart A: k3, skp, k4. Chart D: *p2, k1tbl*, repeat *–* 2(4)6 times in total, p2(1)0.
Chart C: p1, 5 st bobble, p1, move 1 st to the left (hold 1 st in front, p1, knit the st on hold), p1, move 1 st to the left, move 1 st to the right (hold 1 st in back, k1, purl the st on hold), p1, move 1 st to the right, p1, 5 st bobble, p1, p2(1)0.
Chart F: *k1tbl, p2*, repeat *–* to end of round. 2 sts decreased, 48(58)68 sts on the needles.

Row 6: Size XS/S - (Size M k1tbl, p1) Size L k1tbl, p2, k1tbl, p1.
Move on to chart B: p1, k1tbl, p2. Chart E: k8. Chart A: k8:
Chart D: *p2, k1tbl*, repeat *–* 2(4)6 times in total.
P2(1)0. Chart C: p1, k1, p2, k1, p2, k2, p2, k1, p2, k1, p1.
P2(1)0. Chart F: *k1tbl, p2*, repeat *–* to end of round.

Row 7: Size XS/S - (Size M 3 st bobble, p1) Size L k1tbl, p2, 3 st bobble, p1.
Move on to chart B: p1, k1tbl, p2.
Chart E: 4 st cable turn to the right (hold 2 sts in back, k2, knit the 2 sts on hold), k2tog, yo, k1, yo, k1.
Chart A: k1, yo, k1, yo, skp, 4 st cable turn to the left (hold 2 sts in front, k2, knit the 2 sts on hold).
Chart D: *p2, k1tbl, p2, 3 st bobble*, repeat *–* 1(2)3 times in total. P2(1)0.
Chart C: p1, move 1 st to the left (place 1 st in front of the work, p1, knit the st in front), p1, move 1 st to the left, p1, k2, p1, move 1 st to the right (hold 1 st in back, k1, purl the st on hold), p1, move 1 st to the right, p1. P2(1)0.
Chart F: *3 st bobble, p2, k1tbl, p2*, repeat *–* to end of round.
2 sts increased, 50(60)70 sts on the needles.

Row 8: Size XS/S - (Size M k1tbl, p1) Size L k1tbl, p2, k1tbl, p1.
Move on to chart B: p1, k1tbl, p2.
Chart E: k9. Chart A: k9. Chart D: *p2, k1tbl*, repeat *–* 2(4)6 times in total.
P2(1)0. Chart C: p2, k1, p2, move 1 st to the left, k2, move 1 st to the rigt, p2, k1, p2.
P2(1)0. Chart F: *k1tbl, p2*, repeat *–* to end of round.

Row 9: Size XS/S - (Size M k1tbl, p1) Size L k1tbl, p2, k1tbl, p1.
Move on to chart B: p1, k1tbl, p2.
Chart E: k4, k2tog, k3. Chart A: k3, skp, k4.
Chart D: *p2, k1tbl*, repeat *–* 2(4)6 times in total. P2(1)0.
Chart C: p2, move 1 st to the left, p2, move 1 st to the left, move 1 st to the right, p2, move 1 st to the right, p2.
P2(1)0. Chart F: *k1tbl, p2*, repeat *–* to end of round.
2 sts decreased, 48(58)68 sts on the needles.

Row 10: Size XS/S - (Size M k1tbl, p1) Size L k1tbl, p2, k1tbl, p1.
Move on to chart B: p1, k1tbl, p2.
Chart E: k8. Chart A: k8. Chart D: *p2, k1tbl*, repeat *–* 2(4)6 times in total.
P2(1)0. Chart C: p3, move 1 st to the left, p2, k2, p2, move 1 st to the right, p3. P2(1)0.
Chart F: *k1tbl, p2*, repeat *–* to end of round.

Row 11: Size XS/S - (Size M k1tbl, p1) Size L 3 st bobble (knit the st through the front loop, through the back loop and again through the front loop, pass the 2nd and 3rd sts over the 1st st), p2, k1tbl, p1.
Move on to chart B: p1, 3 st bobble (knit the st through the front loop, through the back loop and again through the front loop, pass the 2nd and 3rd sts over the 1st st), p2.
Chart E: 4 st cable turn to the right (hold 2 sts in back, k2, knit the 2 sts on hold), k2tog, yo, k1, yo, k1.
Chart A: k1, yo, k1, yo, skp, 4 st cable turn to the left (hold 2 sts in front, k2, knit the 2 sts on hold).
Chart D: *p2, 3 st bobble, p2, k1tbl*, repeat *–* 1(2)3 times in total.
P2(1)0. Chart C: p4, move 1 st to the left (place 1 st in front of the work, p1, knit the st in front), p1, k2, p1, move 1 st to the right (hold 1 st in back, k1, purl the st on hold), p4.
P2(1)0. Chart F: *k1tbl, p2, 3 st bobble, p2*, repeat *–* to the end of round.
2 sts increased, 50(60)70 sts on the needles.

Row 12: Size XS/S - (Size M 3 st bobble, p1) Size L k1tbl, p2, 3 st bobble, p1.

Move on to chart B: p1, k1tbl, p2.
Chart E: k9. Chart A: k9.
Chart D: *p2, k1tbl*, repeat *–* 2(4)6 times in total.
P2(1)0. Chart C: p2tog, p3, move 1 st to the left, k2, move 1 st to the right, p3, p2tog.
P2(1)0. Chart F: *k1tbl, p2*, repeat *–* to end of round.
2 sts decreased, 48(58)68 sts on the needles.

Row 13: Size XS/S - (Size M k1tbl, p1) Size L k1tbl, p2, k1tbl, p1.
Move on to chart B: p1, k1tbl, p2. Chart E: k4, k2tog, k3.
Chart A: k3, skp, k4. Chart D: *p2, k1tbl*, repeat *–* 2(4)6 times in total.
P2(1)0. Chart C: p5, move 1 st to the left, move 1 st to the right, p5.
P2(1)0. Chart F: *k1tbl, p2*, repeat *–* to end of round.
2 sts decreased, 46(56)66 sts on the needles.

Row 14: Size XS/S - (Size M 3 st bobble, p1) Size L k1tbl, p2, 3 st bobble, p1.
Move on to chart B: p1, k1tbl, p2.
Chart E: k8. Chart A: k8.
Chart D: *p2, k1tbl*, repeat *–* 2(4)6 times in total.
P2(1)0. Chart C: p6, k2, p6. P2(1)0.
Chart F: *k1tbl, p2*, repeat *–* to end of round.

Row 15: Size XS/S - (Size M 3 st bobble, p1) Size L k1tbl, p2, 3 st bobble, p1.

Move on to chart B: p1, k1tbl, p2.
Chart E: 4 st cable turn to the right, k2tog, yo, k1, yo, k1.
Chart A: k1, yo, k1, yo, skp, 4 st cable turn to the left.
Chart D: *p2, k1tbl, p2, 3 st bobble*, repeat *–* 1(2)3 times in total.
P2(1)0. Chart C: p2tog, p4, k2, p4, p2tog.
P2(1)0. Chart F: *3 st bobble, p2, k1tbl, p2*, repeat *–* to end of round.

46(56)66 sts on the needles.

 

Day 9

Knit 1 round, purl 1 round and at the same time evenly increase 10(8)6 sts = 56(64)72 sts.

Work following the chart.

Row 1: 4 st cable turn to the left (hold 2 sts in front, k2, knit the 2 sts on hold), 4 st cable turn to the right (hold 2 sts in back, k2, knit the 2 sts on hold).

Repeat 7(8)9 times in total.

Rows 2–4: knit all sts.

Row 5: 4 st cable turn to the right, 4 st cable turn to the left. Repeat 7(8)9 times in total.

Rows 6–8: knit all sts.

Works rows 1 and 2 once more.

 

Day 10

Purl 1 round and at the same time evenly decrease 4(8)12 sts = 52(56)60 sts.

Double-pointed needles: Work following the chart.

 

Row 1: [Chart A: p1, k1, yo, *k1, p1*, repeat *–* 2 times in total, skp (=slip 1, knit 1, pass the slipped st over), repeat *–* 2 times, k1.

Size XS/S - (Size M p1, k1) Size L p1, k1, p1, k1.

Chart B: *p1, k1*, repeat *–* 3 times in total. K2tog, repeat *–* 2 times, yo, k1].

 

Repeat  [] 2 times in total.

Row 2: [Chart A: p1, k2, yo, *k1, p1*, repeat *–* 2 times in total, skp, p1, k1, p1, k1. Then: Size XS/S - (Size M p1, k1) Size L p1, k1, p1, k1. Move on to chart B: *p1, k1*, repeat *–* 2 times in total, p1, k2tog, repeat *–* 2 times, yo, k2].

Repeat [] 2 times in total.

Row 3: [Chart A: p1, k2, p1, yo, *k1, p1*, repeat *–* 2 times in total, skp, k1, p1, k1. Then: Size XS/S - (Size M p1, k1) Size L p1, k1, p1, k1. Move on to chart B: *p1, k1*, repeat *–* 2 times in total, k2tog, repeat *–* 2 times, yo, p1, k2].

Repeat [] 2 times in total.

Row 4: [Chart A: p1, k2, p1, k1, yo, *k1, p1*, repeat *–* 2 times in total, skp, p1, k1. Then: Size XS/S - (Size M p1, k1) Size L p1, k1, p1, k1. Move on to chart B: p1, k1, p1, k2tog, *p1, k1*, repeat *–* 2 times in total, yo, k1, p1, k2].

Repeat [] 2 times in total.

Row 5: [Chart A: p1, k2, p1, k1, p1, yo, *k1, p1*, repeat *–* 2 times in total, skp, k1. Then: Size XS/S - (Size M p1, k1) Size L p1, k1, p1, k1. Move on to chart B: p1, k1, k2tog, *p1, k1*, repeat *–* 2 times in total, yo, p1, k1, p1, k2].

Repeat [] 2 times in total.

Row 6: [Chart A: p1, k2, p1, k1, p1, k1, yo, *k1, p1*, repeat *–* 2 times in total, skp. Then: Size XS/S - (Size M p1, k1) Size L p1, k1, p1, k1. Move on to chart B: p1, k2tog, *p1, k1*, repeat *–* 2 times in total, yo, k1, p1, k1, p1, k2].

Repeat [] 2 times in total.

Work rows 1-6 once more.

 

Magic Loop technique:  Work following the chart.

 

Row 1: [Size XS/S - (Size M k1) Size L p1, k1.

Work following the chart: *p1, k1*, repeat *–* 3 times in total, k2tog, repeat *–* 2 times, yo, k1, p1, k1, yo, *k1, p1*, repeat *–* 2 times in total, skp (= slip 1, knit 1, pass the slipped st over), repeat *–* 2 times, k1.

Size XS/S - (Size M p1) Size L p1, k1].

Repeat [] 2 times in total.

Row 2: [Size XS/S - (Size M k1) Size L p1, k1.

Work following the chart: *p1, k1*, repeat *–* 2 times in total, p1, k2tog, repeat *–* 2 times, yo, k2, p1, k2, yo, *k1, p1*, repeat *–* 2 times in total, skp, p1, repeat *–* once, k1.

Size XS/S - (Size M p1) Size L p1, k1].

Repeat [] 2 times in total.

Row 3: [Size XS/S - (Size M k1) Size L p1, k1.

Work following the chart: *p1, k1*, repeat *–* 2 times in total, k2tog, repeat *–* 2 times, yo, p1, k2, p1, k2, p1, yo, *k1, p1*, repeat *–* 2 times in total, skp, k1, p1, k1.

Size XS/S - (Size M p1) Size L p1, k1].

Repeat [–] 2 times in total.

Row 4: [Size XS/S - (Size M k1) Size L p1, k1.

Work following the chart: *p1, k1*, p1, k2tog, repeat *–* 2 times, yo, k1, p1, k2, p1, k2, p1, k1, yo, *k1, p1*, repeat *–* 2 times in total, skp, p1, k1.

Size XS/S - (Size M p1) Size L p1, k1].

Repeat [] 2 times in total.

Row 5: [Size XS/S - (Size M k1) Size L p1, k1.

Work following the chart: *p1, k1*, k2tog, repeat *–* 2 times, yo, p1, k1, p1, k2, p1, k2, p1, k1, p1, yo, *k1, p1*, repeat *–* 2 times in total, skp, k1.

Size XS/S - (Size M p1) Size L p1, k1].

Repeat [] 2 times in total.

Row 6: [Size XS/S - (Size M k1) Size L p1, k1.

Work following the chart: p1, k2tog, *p1, k1*, repeat *–* 2 times in total, yo, k1, p1, k1, p1, k2, p1, k2, p1, k1, p1, k1, yo, *k1, p1*, repeat *–* 2 times in total, skp.

Size XS/S - (Size M p1) Size L p1, k1].

Repeat [] 2 times in total.

Work rows 1–6 once more.

 

Day 11

Knit 1 round and at the same time evenly decrease 2(4)8 sts:

Double-pointed needles:

XS/S: 1 st at the beginning of needle II and at the end of needle III

(M: 1 st at the end of needles I and III and at the beginning of needles II and IV)

L: 2 sts at the end of needles I and III and at the beginning of needles II and IV = 50(52)52 sts.

Purl 1 round and follow the chart:

 

Row 1: [Chart A: p1, yo, k3, skp (=slip 1, knit 1, pass the slipped st over), k3, yo, skp, p1.

Size XS/S P2tog (M p1, p2tog) L p1, p2tog.

Chart B: p1, k2tog, yo, k3, k2tog, k3, yo.]

Repeat [–] once more.

=48(50)50 sts on the needles.

 

Row 2:  [Chart A: p1, k1, yo, k3, skp, k4, p1.

Size XS/S p1 (M p2) L p2.

Chart B: p1, k4, k2tog, k3, yo, k1.]

Repeat [–] once more.

 

Row 3: [Chart A: p1, k2, yo, k3, skp, k3, p1.

Size XS/S p1(M p2) L p2.

Chart B: p1, k3, k2tog, k3, yo, k2.]

Repeat [–] once more.

 

Row 4: [Chart A: p1, k3, yo, k3, skp, k2, p1.

Size XS/S p1 (M p2) L p2.

Chart B: p1, k2, k2tog, k3, yo, k3.]

Repeat [–] once more.

 

Row 5: [Chart A: p1, k4, yo, k3, skp, k1, p1.

Size XS/S p1 (M p2) L p2.

Chart B: p1, k1, k2tog, k3, yo, k4.]

Repeat [–] once more.

 

Row 6: [Chart A: p1, k5,yo, k3, skp, p1.

Size XS/S p1 (M p2) L p2.

Chart B: p1. k2tog, k3, yo, k5.]

Repeat [–] once more.

 

Row 7: [Chart A: p1, yo, k3, skp, k5, p1.

Size XS/S p1 (M p2) L p2.

Chart B: p1, k5, k2tog, k3, yo.]

Repeat [–] once more.

 

Row 8: [Chart A: p2, yo, k3,skp, k4, p1.

Size XS/S p1 (M p2) L p2.

Chart B: p1, k4, k2tog, k3, yo, p1.]

Repeat [–] once more.

 

Row 9: [Chart A: p3, yo, k3, skp, k3, p1.

Size XS/S p1(M p2) L p2.

Chart B: p1, k3, k2tog, k3, yo, p2.]

Repeat [–] once more.

 

Row 10: Chart A: p4, yo, k3, skp, k2, p1.

Size XS/S p1(M p2) L p2.

Chart B: p1, k2, k2tog, k3, yo, p3.

Chart A: p4, yo, k3, skp, k2, p1.

Size XS/S p1(M p2) L p2.

P1, k2, k2tog, k3, yo, p1, slip 2 sts with the yarn in front.

 

Magic Loop technique:

Knit 1 round and at the same time decrease 4(6)10 sts:

Size XS/S: *decrease 1 st, k22, decrease 1 st*, repeat *–*

(M: *decrease 1 st, k1, decrease 1 st, k21, decrease 1 st*, repeat *–*)

L *decrease 1 st, k1, decrease 1 st, k1, decrease 1 st, k17, decrease 1 st, k1, decrease 1 st*, repeat *–*

= 48(50)50 sts.

Purl 1 round and follow the chart:

 

Row 1: [p2, k2tog, yo, k3, k2tog, k3, yo, p1, yo, k3, skp (=slip 1, knit 1 and pass the slipped st over), k3, yo, skp.

Size XS/S p1(M p2) L p2].

Repeat [–] once more.

 

Row 2: [p2. k4, k2tog, k3, yo, k1, p1, k1, yo, k3, skp, k4.

Size XS/S p1(M p2) L p2].

Repeat [–] once more.

 

Row 3: [: p2, k3, k2tog, k3, yo, k2, p1, k2, yo, k3, skp, k3.

Size XS/S p1(M p2) L p2].

Repeat [–] once more.

 

Row 4: [p2, k2, k2tog, k3, yo, k3, p1, k3, yo, k3, skp, k2.

Size XS/S p1(M p2) L p2].

Repeat [–] once more.

 

Row 5: [p2, k1, k2tog, k3, yo,k4, p1, k4, yo, k3, skp, k1.

Size XS/S p1(M p2) L p2].

Repeat [–] once more.

 

Row 6: [p2, k2tog, k3, yo, k5, p1, k5,yo, k3, skp.

Size XS/S p1(M p2) L p2].

Repeat [–] once more.

Row 7: [p2, k5, k2tog, k3, yo, p1, yo, k3, skp, k5.

Size XS/S p1(M p2) L p2].

 

Repeat [–] once more.

Row 8: [p2, k4, k2tog, k3, yo, p1, p2, yo, k3, skp, k4.

Size XS/S p1(M p2) L p2].

Repeat [–] once more.

 

Row 9: [p2, k3, k2tog, k3, yo, p2, p3, yo, k3, skp, k3.

Size XS/S p1(M p2) L p2].

Repeat [–] once more.

 

Row 10: [p2, k2, k2tog, k3, yo, p3, p4, yo, k3, skp, k2.

Size XS/S p1(M p2) L p2].

Repeat [–] once more.

 

Day 12

 

Double-pointed needles: work following the chart.

Row 1: Chart A: slip 3 sts with the yarn in front, p2, yo, k3, skp (=slip 1, knit 1, pass the slipped st over), k1, p1.

Size XS/S p1 (M p2) L p2.

Chart B: p1, k1, k2tog, k3, yo, p2, slip 5 sts with the yarn in front, p2, yo, k3, skp, k1, p1.

Size XS/S p1 (M p2) L p2.

Chart C:. p1, k1, k2tog, k3, yo, p4.

Row 2: Chart A: p6, yo, k3, skp, p1.

Size XS/S p1 (M p2) L p2.

Chart B: p1, k2tog, k3, yo, p11, yo, k3, skp, p1.

Size XS/S p1 (M p2) L p2.

Chart C: p1, k2tog, k3, yo, p3, slip 2 sts with the yarn in front.

Row 3: Chart A: slip 3 sts with the yarn in front, p5, k3, p1.

Size XS/S p1 (M p2) L p2.

Chart B: p1, k3, p5, slip 5 sts with the yarn in front, p5, k3, p1.

Size XS/S p1 (M p2) L p2.

Chart C: p1, k3, p7.

Row 4: Chart A: p8, k1tbl, yo, k2tog, p1.

Size XS/S p1 (M p2) L p2.

Chart B: p1, skp, yo, k1tbl, p15, k1tbl, yo, k2tog, p1.

Size XS/S p1 (M p2) L p2.

Chart C: p1, skp, yo, k1tbl, p5, slip 2 sts with the yarn in front.

Row 5: Chart A: slip 3 sts with the yarn in front, p5, k1tbl, p1, k1tbl, p1.

Size XS/S p1 (M p2) L p2.

Chart B: p1, k1tbl, p1, k1tbl, p5, slip 5 sts with the yarn in front, p5, k1tbl, p1, k1tbl, p1.

Size XS/S p1 (M p2) L p2.

Chart C: p1, k1tbl, p1, k1tbl, p7.

Row 6: Work as you did on row 4.

Row 7: Work as you did on row 5.

Row 8: Chart A: put the needle through the st purlwise and take the needle top-down under all 4 strands of yarn in front of the work. Pick up the yarn and pull it up through the st.

P7, k1tbl, yo, k2tog, p1.

Size XS/S p1 (M p2) L p2.

Chart B: p1, skp, yo, k1tbl, p7, put the needle through the st purlwise and take the needle top down under all 4 strands of yarn in front of the work. Pick up the yarn and pull it up through the st, p7, k1tbl, yo, k2tog, p1.

Size XS/S p1 (M p2) L p2.

Chart C: p1, skp, yo, k1tbl, p7.

 

Magic loop  technique: work following the chart. 

Row 1: [p2, k1, k2tog, k3, yo, p2, slip 5 sts with the yarn in front, p2, yo, k3, skp (= slip 1, knit 1, pass the slipped st over), k1.

Size XS/S p1 (M p2) L p2].

Repeat [-] once more.

Row 2: [p2, k2tog, k3, yo, p3, yo, p11, k3, skp.

Size XS/S p1 (M p2) L p2].

Repeat [-] once more.

Row 3: [p2, k1tbl, k2, p5, slip 5 sts with the yarn in front, p5, k2, k1tbl.

Size XS/S p1 (M p2) L p2].

Repeat [-] once more.

Row 4: [p2, skp, yo, k1tbl, p15, k1tbl, yo, k2tog.

Size XS/S p1 (M p2) L p2].

Repeat [-] once more.

Row 5: [p2, k1tbl, p1, k1tbl, p5, slip 5 sts with the yarn in front, p5, k1tbl, p1, k1tbl.

Size XS/S p1 (M p2) L p2].

Repeat [-] once more.

Row 6: Work as you did on row 4.

Row 7: Work as you did on row 5.

Row 8: [p2, skp, yo, k1tbl, p7, put the needle through the st purlwise and then take the needle top down under all 4 strands of yarn in front of the work . Using a crochet hook, pick up the yarn and pull it up through the st, p7, k1tbl, yo, k2tog.

Size XS/S p1 (M p2) L p2].

Repeat [-] once more.

 

Day 13

Double-pointed needles: distirubute the sts on the needles:  13,12,11,12 (13,12,13,12) 13,12,13,12 sts.

The heel

Row 1: Work the 13 sts on needle I onto needle IV :*slip 1 with the yarn in back, k1*, repeat *-* 6 times in total, slip 1 st. (=25 sts)

Row 2: Turn work and purl one row.

[Row 3: *K1, slip 1 with the yarn in back*, repeat *-* 12 times in total, k1.

Row 4: Turn work and purl one row.

Row 5: *Slip 1 with the yarn in back, k1*, repeat *-* 12 times in total, slip 1.

Row 6: Turn work and purl one row. ]

Repeat [-] for a total of 3 times.

Heel is now about 5,5 cm. If necessary repeat [-] once more.

Row 3: *K1, slip 1 with the yarn in back*, repeat *-* 12 times in total, k1.

Row 4: Turn work and purl one row.

 

Magic loop technique: The sts will be distributed in the following way: Sock 1: 25(25)25 sts before the loop, 23(25)25 sts after the loop. Sock 2: 25(25)25 sts before the loop and 23(25)25 sts after the loop.

The heel

[Row 1: *Slip 1 with the yarn in back, k1*, repeat *-* 12 times in total, slip 1.

Row 2: Turn work and purl one row.

Row 3: *K1, slip 1 with the yarn in back*, repeat *-* 12 times in total, k1.

Row 4: Turn work and purl one row.]

Repeat [-] 4 times in total.

Heel is now about 6 cm. If necessary repeat [-] once more. 

 

Day 14

Turning the heel:

*Slip 1 st with the yarn in back, k1*, repeat *-* 7 times in total, slip 1 with the yarn in back. Work the skp decrease.

Turn work, p6, p2tog.

[Turn work. *Slip 1, k1*, repeat *-* 3 times in total, skp.

Turn work, slip 1, p5, p2tog.

Turn work. *Slip 1, k1*, repeat *-* 3 times in total, skp.

Turn work, p6, p2tog.

Turn work. *Slip 1, k1*, repeat *-* 3 times in total, skp.

 Turn work, slip 1, p5, p2tog.]

Repeat [-] 4 times in total.

Turn work, slip 1, k6.

Using a free needle/the left-hand needle, pick up 13 sts along the left edge of the heel and knit the sts through the back loop.

Size XS/S p0 (M p1) L p1.

P1, k1tbl, p1, k1tbl, p15, k1tbl, p1, k1tbl, p1.

Size XS/S p0 (M p1) L p1.

Double-pointed needles: pick up 13 sts along the right edge of the heel and knit the sts through the back loop. K3 onto needle IV.

 

Magic loop technique: work the heel for the 2nd sock following the instructions from days 13 and 14.

Using a spare needle pick up 13 sts along the right edge of the 1st sock's heel and knit the sts through the back loop. Knit the remaining heel sts.

 

Day 15

Work the sole sts (needles I and IV) in stockinette st and begin the gusset decreases. Work the sts on the top of the sock following the chart.

The gusset decreases

Double-pointed needles: k2tog at the end of needle I and at the beginning of needle IV work the skp decrease (=slip 1 st knitwise, knit 1, pass the slipped st over).

Work the first decreases on the next round after picking up the sts from the heel flap, knit 2 rounds without decreases and then work the decrease round again. Knit 3 rounds without decreases, repeat the decrease round, knit 4 rounds and repeat the decreases.

Magic loop technique: work the decreases on the next round after picking up the sts from the heel flap. At the end of the sole sts, just before the loop, k2tog. At the beginning of the sole sts work the skp decrease (= slip 1 st knitwise, knit 1, pass the slipped st over). Knit 2 rounds without decreases and then work the decreases again. Knit 3 rounds without decreases, repeat the decrease round, knit 4 rounds and repeat the decreases.

Follow the chart for the sts on the top of the foot.

right-leaning 4 st decrease (= move the yarn to the front over the left needle. Slip 4 sts one at a time over the yarn from the left needle. Move the loop of yarn onto the right needle)

Watch a helpful video on YouTube.

left-leaning 4 st decrease (= slip 4 sts knitwise from the left-hand needle one at a time. Move the yarn to the front over the right-hand needle. Move the 4 sts one at a time over the yarn off the right-hand needle)

Watch a helpful video on YouTube.

 

 

Row 1: XS/S - (M p1) L p1.

P1, skp, yo, k1tbl, p1, 4 st right-leaning decrease (= move the yarn to the front over the left needle. Slip 4 sts one at a time over the yarn from the left needle. Move the loop of yarn onto the right needle), *yo, k1*, repeat *–* 4 more times and yo, 4 st left-leaning decrease (= slip 4 sts knitwise from the left-hand needle one at a time. Move the yarn to the front over the right-hand needle. Move the 4 sts one at a time over the yarn off the right-hand needle), p1, k1tbl, yo, k2tog, p1.

P0(1)1.

Row 2: P0(1)1.

P1, k1tbl, p1, k1tbl, p1, k13, p1, k1tbl, p1, k1tbl, p1.

P0(1)1.

Row 3: P0(1)1.

P1, skp, yo, k1tbl, p1, k13, p1, k1tbl, yo, k2tog, p1.

Row 4: Work as you did on row 2.

On the top of the foot, repeat rows 1–4 as follows:

Shoe size 36/37: 1 time in total

Shoe size 38/39: 2 times

Shoe size 40/41: 3 times

 

Day 16

 

On the sole sts, keep working in stockinette st and continue the gusset decreases.

On the top of the sock work following the chart:

 

 

Row 1: XS/S: - (M:  p1) L: p1.

P1, skp (= slip 1 st knitwise, k1, pass the slipped st over),yo, k1tbl, p1, 4 st right-leaning decrease (=move the yarn to the front over the left needle. Slip 4 sts one at a time over the yarn from the left needle. Move the loop of yarn onto the right needle), *yo, k1*, repeat *–* 4 more times, yo, 4 st left-leaning decrease (=slip 4 sts knitwise from the left-hand needle onto the right-hand needle one at a time. Move the yarn to the front over the right-hand needle. Move the 4 sts one at a time over the yarn off the right-hand needle), p1, k1tbl, yo, k2tog, p1.

P0(1)1.

Row 2: P0(1)1.

P1, k1tbl, p1, k1tbl, p1, k13, p1, k1tbl, p1, k1tbl, p1.

P0(1)1.

Row 3: P0(1)1.

P1, yo, skp, yo, skp, k13, k2tog, yo, k2tog, yo, p1.

P0(1)1.

Row 4: P0(1)1.

P1, yo, p1, skp, k15, k2tog, p1, yo, p1.

P0(1)1.

Row 5: P0(1)1.

P1, work the yo 3 times (knit, purl, knit), p1, work the skp decrease 2 times, k9, k2tog 2 times, p1, work the yo 3 times (knit, purl, knit), p1.

P0(1)1.

Row 6: P0(1)1.

P1, k1, yo, k1, yo, k1, p1, s2kp (= slip 2 sts as if you would knit them together, k1, pass the slipped sts over), k7, k3tog, p1, k1, yo, k1, yo, k1, p1.

P0(1)1 = 48(50)50 sts.

 

Day 17

Keep working the sole sts in stockinette st.

Work the sts on the top of the sock following the chart.

1. krs: Neulo ensin XS/S-koossa 0 (M-koossa 1) L-koossa 1 nurin.

Row 1:XS/S: - (M: p1) L: p1 .

P1, k2, yo, k1, yo, k2, p1, s2kp (= slip 2 sts as if you would knit them together, k1, pass the slipped sts over), k3, k3tog, p1, k2, yo, k1, yo, k2, p1.

P0(1)1.

Row 2: P0(1)1.

P1, k4, yo, k3, p1, skp, k1, k2tog, p1, k3, yo, k4, p1.

P0(1)1.

Row 3: P0(1)1.

P1, k8, p1, yo, sk2p (= slip 1, k2tog, pass the slipped st over), yo, p1, k8, p1.

P0(1)1.

 

Day 18

Keep working the sole sts in stockinette st.

Work the instep sts following the chart:

 

Row 1: Size XS/S - (M p1) L p1.

P1, yo, skp (= slip 1 st knitwise, k1, pass the slipped st over), k4, k2tog, yo, p5, yo, skp, k4, k2tog, yo, p1.

P0(1)1.

Row 2: P0(1)1.

P1, k7, p1, k5, p1, k7, p1.

P0(1)1.

Row 3: P0(1)1.

P1, k1, yo, skp, k2, k2tog, yo, p1, k5, p1, yo, skp, k2, k2tog, yo, k1, p1.

Row 4: P0(1)1.

P1, k2, yo, skp, k2tog, yo, p2, 5 st cable turn (hold 2 sts in back, k3, knit the 2 sts on hold), p2, yo, skp, k2tog, yo, k2, p1.

 

Day 19

Keep working the sole sts in stockinette st.

Work the instep sts following the chart.

 

Row 1: Size XS/S - (M p1) L p1.

P1, k3, yo, skp (= slip 1 st knitwise, k1, pass the slipped st over), p3, k5, p3, k2tog, yo, k3, p1.

P0(1)1.

Row 2: P0(1)1.

P1, yo, skp, k2, yo, skp, p2, k5, p2, k2tog, yo, k2, k2tog, yo, p1.

P0(1)1.

Row 3: P0(1)1.

P1, k1, yo, skp, k2, yo, skp, p1, k5, p1, k2tog, yo, k2, k2tog, yo, k1, p1.

P0(1)1.

Row 4: P0(1)1.

P1, k2, yo, skp, k2, yo, skp, 5 st cable turn (hold 2 sts in back, k3, knit the 2 sts on hold), k2tog, yo, k2, k2tog, yo, k2, p1.

P0(1)1.

Row 5: P0(1)1.

P1, k3, yo, skp, k11, k2tog, yo, k3, p1.

P0(1)1.

 

Day 20

Keep working the sole sts in stockinette st.

Work the instep sts following the chart.

Row 1: Size XS/S p0 (M p1) L p1.

P1, yo, skp (= slip 1 st knitwise, k1, pass the slipped st over), k2, yo, skp, k9, k2tog, yo, k2, k2tog, yo, p1.

P0(1)1.

Row 2: P0(1)1.

P1, k1, yo, skp, k2, yo, skp, k7, k2tog, yo, k2, k2tog, yo, k1, p1.

P0(1)1.

Row 3: P0(1)1.

P1, k2, yo, skp, k2, yo, skp, 5 st cable turn (hold 2 sts in back, k3, knit the 2 sts on hold), k2tog, yo, k2, k2tog, yo, k2, p1.

P0(1)1.

Row 4: P0(1)1.

P1, k3, yo, skp, k11, k2tog, yo, k3, p1.

P0(1)1.

 

Day 21

Keep working the sole sts in stockinette st.

Work the instep sts following the chart.

Row 1: Size XS/S - (M p1) L p1.

P1, yo, skp (= slip 1 st knitwise, k1, pass the slipped st over), k2, yo, skp, k9, k2tog, yo, k2, k2tog, yo, p1.

P0(1)1.

Row 2: P0(1)1.

P1, k1, yo, skp, k2, yo, skp, k7, k2tog, yo, k2, k2tog, yo, k1, p1.

P0(1)1.

Row 3: P0(1)1.

P1, k2, yo, skp, k2, yo, skp, 5 st cable turn (hold 2 sts in back, k3, knit the 2 sts on hold), k2tog, yo, k2, k2tog, yo, k2, p1.

P0(1)1.

Row 4: P0(1)1.

P1, k3, yo, skp, k11, k2tog, yo, k3, p1.

P0(1)1.

Row 5: Work as you did on row 1.

Tomorrow we start the toe decreases after 3 rows so if there is long way to end of little toe repeat rows 2-5.

 

Day 22

 

Row 1: Work the sole sts in stockinette st. Work the instep sts as follows:

Size XS/S - (M p1) L p1.

P1, k1, yo, skp (= slip 1 st knitwise, k1, pass the slipped st over), k2, yo, skp, k7, k2tog, yo, k2, k2tog, yo, k1, p1.

P0(1)1.

Row 2: Keep working the sole sts in stockinette st and work the instep sts as follows:

P0(1)1.

P1, k2, yo, skp, k2, yo, skp, 5 st cable turn (hold 2 sts in back, k3, knit the 2 sts on hold), k2tog, yo, k2, k2tog, yo, k2, p1.

P0(1)1.

Row 3: Keep working the sole sts in stockinette st and work the instep sts as follows:

P0(1)1.

P1, k3, yo, skp, k11, k2tog, yo, k3, p1.

Begin the toe decreases.

Double-pointed needles

Row 4: Work in stockinette st until 3 sts remain on needle I, k2tog, k1.

P0(1)1.

P1, skp, k2, yo, skp, k9, k2tog, yo, k2, k2tog, p1.

P0(1)1.

K1, skp, knit to end of needle IV.

4 sts decreased = 44(46)46 sts.

Row 5: Work the sole sts in stockinette st and work the instep sts as follows:

P0(1)1.

P1, k4, yo, skp, k7, k2tog, yo, k4, p1.

P0(1)1.

Magic Loop technique

Row 4: P0(1)1.

P1, skp, k2, yo, skp, k9, k2tog, yo, k2, k2tog, p1.

P0(1)1.

K1, skp, work in stockinette st until 3 sts remain on row, k2tog, k1.

4 sts decreased = 44(46)46 sts.

Row 5: P0(1)1.

P1, k4, yo, skp, k7, k2tog, yo, k4, p1.

P0(1)1.

Work the sole sts in stockinette st.

 

Day 23

 

Double-pointed needles

Row 1: Work in stockinette st until 3 sts remain on needle I, k2tog, k1.

Size XS/S - (M p1) L p1.

P1, skp (= slip 1 st knitwise, k1, pass the slipped st over), k3, yo, skp, 5 st cable turn (hold 2 sts in back, k3, knit the 2 sts on hold), k2tog, yo, k3, k2tog, p1.

P0(1)1.

K1, skp, knit to end of needle IV.

4 sts decreased = 40(42)42 sts.

Row 2: Work needle I in stockinette st and work the instep sts as follows:

P0(1)1.

P1, k17, p1.

P0(1)1. Work needle IV in stockinette st.

Row 3: Work in stockinette st until 3 sts remain on needle I, k2tog, k1.

P0(1)1.

P1, skp, k13, k2tog, p1.

P0(1)1.

K1, skp, knit to end of needle IV.

4 sts decreased = 36(38)38 sts.

Row 4: work in stockinette st until 3 sts remain on needle I, k2tog, k1.

P0(1)1.

P1, skp, k11, k2tog, p1.

P0(1)1.

K1, skp, knit to end of needle IV.

4 sts decreased = 32(34)34 sts.

Rows 5–9: Keep decreasing in this manner until 12(14)14 sts remain.

Row 10: Work in stockinette st until 3 sts remain on needle I, k2tog, k1.

P0(1)1.

P1, sk2p (= slip 1 st knitwise, k2tog, pass the slipped st over), p1.

P0(1)1.

K1, skp, knit to end of needle IV.

4 sts decreased = 8(10)10 sts.

Break the yarn and pull it tightly through the remaining sts.

Magic Loop technique

Row 1: Size XS/S - (M p1) L p1.

P1, skp (= slip 1 st knitwise, k1, pass the slipped st over), k3, yo, skp, 5 st cable turn (hold 2 sts in back, k3, knit the 2 sts on hold), k2tog, yo, k3, k2tog, p1.

P0(1)1.

K1, skp, work in stockinette st until 3 sts remain, k2tog, k1.

4 sts decreased = 40(42)42 sts.

Row 2: P0(1)1.

P1, k17, p1.

P0(1)1.

Work the sole sts in stockinette st.

Row 3: P0(1)1.

P1, skp, k13, k2tog, p1.

P0(1)1.

K1, skp, work in stockinette st until 3 sts remain, k2tog, k1.

4 sts decreased = 36(38)38 sts.

Row 4: P0(1)1.

P1, skp, k11, k2tog, p1.

P0(1)1.

K1, skp, work in stockinette st until 3 sts remain, k2tog, k1.

4 sts decreased = 32(34)34 sts.

Rows 5–9: Keep decreasing in this manner until 12(14)14 sts remain.

Row 10: P0(